[Go Back]

New Construction

“We enjoy tackling major projects – preventing problems, controlling costs, solving challenges. Our clients enjoy the results.”
Richard Dellinger, Senior Project Manager

“Twin delivers for us every time – for projects from medical suites with specialized installation to surgical suites.”   
–Mr. Thomas Bolton,  INOVA Hospital Systems

“Permitting delays had set back our schedule. Twin put our project on a fast track so we could be ready for the Christmas shopping season.”
– Morris Diesel, The Beneson Capital Company, Belle View Shopping Center

 “Twin gave us the high-end renovation we needed without disrupting our members’ activities.”
– Brian Dolislager, General Manager, Evergreen Country Club

   

New Construction Featured Project:
Carl D. Silver Health, Mary Washington Hospital

Carl D. Silver Health Center
Lloyd F. Moss Free Clinic
32,000 sf
Client: Mary Washington Hospital /
Contract: $5.8 M
   
Project:
Construction of free-standing medical office building on the campus of Mary Washington Hospital
Buildout for industry-leading free clinic on the first floor
Challenges:
Starting project just before winter, with an aggressive completion date
Developing a hillside site requiring rock excavation, sheeting & shoring
Fast-track coordination between owner, architect, consultants
Features:
New two-story building with a radius facade consisting of multiple materials
Dramatic exterior lighting and finishes
State-of-the-art medical facility on first floor
Lower-level main entrance from street-level parking lot
Second-floor entrance from upper parking lot
Family Birthing Image5
1 Family Birthing Image5 1 Family Birthing Image5 1 Family Birthing Image5 1 Family Birthing Image5 1

Family Birthing Image5


Overview:

Mary Washington Hospital engaged Twin Contracting to build the Lloyd F. Moss Free Clinic, a leading-edge facility for the citizens of Fredericksburg and surrounding counties. Twin competed with three other general contractors for the project.

This structure, one of the most advanced of its type, is showcased by the Hospital as an example of contemporary, well-constructed medical facilities for the uninsured and underinsured. 

Construction Highlights

Twin constructed a dedicated exterior entrance to the first-floor reception area. Skilled subcontractors completed the 15,000-square-foot medical facility on that level – treatment rooms, nurses’ stations, a physician’s lounge, a lab area, staff offices, a conference room, an ultra-modern dental area and a fully stocked pharmacy.

The project also called for an exterior entrance from the upper parking lot and terrace to the second floor, which has been set aside for future expansion of medical services.

The building’s striking design makes it a focal point of the upper hospital campus. Construction was completed on budget and on schedule. The grand opening, held in May 2007, was attended by Virginia governor Tim Kane and other political and medical dignitaries.

Sophisticated Systems

Twin Contracting installed
state-of-the art service systems
on the basement level:

  • Air handlers
  • Water softeners and sanitization
  • Boilers and steam generators
  • Medical air and dental vacuum systems
  • Fire and alarm systems
  • Advanced HVAC filtration and control


 
 
   
   
  [top of page]